Reading Comprehension HESI A2 Related

Review Reading Comprehension HESI A2 related questions and content

GOLDEN GATE BRIDGE:
Linking San Francisco to Marin County in California, the Golden Gate Bridge is one of the most famous bridges in the world. The bridge crosses over a narrow strait that connects the Pacific Ocean to San Francisco Bay. Prior to the bridge, people traveled by ferry boat across the strait.
Although most people thought a bridge was necessary to expedite travel, some residents of the Bay Area felt the risk of building the bridge was too great. Joseph Strauss believed that nothing was impossible and that dreams would never come to fruition if risks weren't taken. So, he decided to gather the best and brightest builders, architects, and workers to embark on the challenge of building a bridge across the Golden Gate Strait.
With safety nets in place, construction began in 1937. Building the anchorages first, the builders then moved on to the towers on each end, and then to the three-foot-thick cables to support the suspension bridge. Lastly, workers labored to complete the roadway, which became the most dangerous and treacherous part of the entire task. The builders had to keep the bridge balanced so it wouldn't fall into the bay.
Today, over sixty-five years later, the bridge remains a lifeline for the people of the San Francisco Bay Area.

Which part of the bridge was built first?

  • A. Cables
  • B. Roadway
  • C. Sidewalks
  • D. Towers
Correct Answer: B

Rationale: The correct answer is B: Roadway. In the construction of the Golden Gate Bridge, as with many bridges, the roadway was built first. The roadway provides the foundation and support for the rest of the structure, allowing vehicles and pedestrians to access the bridge. The construction process typically starts with the roadway to establish a base before moving on to other components like cables, towers, and sidewalks. Therefore, the roadway is an essential initial component in bridge construction. Choices A, C, and D are incorrect because, according to the provided extract, the anchorages were built first, followed by the towers, cables, and finally, the completion of the roadway. This sequence highlights the significance of establishing the structural support before the construction of other elements of the bridge.